Category Archives: Projects

Veteran’s Memorial Project

The Inlet Veterans (Post #1402) are seeking to significantly rehabilitate the Veterans Memorial in front of the Town Hall in the hamlet of Inlet. The existing stone marker which was installed over 50 years ago is in a very sad … Continue reading

Posted in Projects | Comments Off

Arrowhead Park Improvements Phase 2

Open the pdf: Arrowhead Park Improvements Phase 2

Posted in Projects | Comments Off

Photos of Original Arrowhead Casino & How It Became Cottage #2 & #3

Photos of Original Arrowhead Casino & How It Became Cottage #2 & #3 Arrowhead Pavilion 1937Fourth Lake from the channel 1937 Moving Cottage #2 & #3 Р1938 New Cottages #2 & #3 РNovember 1939

Posted in Projects | Comments Off

Proposed Casino Boathouse Reconstruction

Part of the Local Waterfront Revitalization Program (LWRP) 14-101 Arrowhead Casino 2014_9-23-14_SP1 14-101 Arrowhead Casino 2014_9-23-14_SP2 14-101 Arrowhead Casino 2014_9-23-14_SP3 Casino-Pavilion¬† How the casino might look      

Posted in Projects | Comments Off

Final Casino-Pavilion Variance Application 12-15-13

Open the pdf: Final Casino-Pavilion Variance Application 12-15-13

Posted in Projects | Comments Off

Draft Townsend Trail Phase 2 Plans Updated October 8, 2015

Open the pdf: Draft Townsend Trail Phase 2 Plans Updated October 8, 2015

Posted in Projects | Comments Off

Paver Program

Click here to learn more about Inlet’s paver program in Arrowhead Park: Park Paver Program

Posted in Projects | Comments Off

Bench Program

Click here to learn more about the benches you see around town: Bench Program

Posted in Projects | Comments Off

Draft Townsend Trail Phase 2 Plans 8-20-15

Open the pdf: Draft Townsend Plans Trail Phase 2 Plans 8-20-15

Posted in Projects | Comments Off

Preliminary Engineering Report Town of Inlet Sewer District No. 1, Extension No. 2

Open the pdf: Preliminary Engineering Report Town of Inlet Sewer District No. 1, Extension No. 2 – May 14, 2015

Posted in Projects | Comments Off